Tee Hai Chemical Warehouse at Tuas Industrial Estate is a “Good Manufacturing Practice (GMP)” building that provides logistics space to the growing Bio-Pharmaceutical industry in Singapore. “GMP” is a production/storage protocol that ensures a quality product, with processes and operations clearly defined and controlled under a governing legislation. This is a five-storey, 18,500sqm GFA facility built on a compact site of area 7500sqm. Floor to floor height of the 1st storey warehouse is 16m and can accommodate 8 tiers of racking, while the upper levels have floor to floor height 8 to 9m with 4 tiers of racking. The sleek and clean form of the aluminium cladded building echoes the spirit of “GMP” and conveys a well intended image to the industry and public.